Road surface work at Gedney Dyke

The disintegrating road surface of the B1359 at Gedney Dyke is due to be repaired.
The stretch of road between Kingsgate/Roper’s Gate junction and Green Dyke will be repaired between next Monday and Wednesday, November 4.
The work will include installing an asphalt reinforcement grid to give the new carriageway a stronger resistance to the movement of the underlying ground.
The road will be closed 24 hours in the first week, open at the weekend and then be closed from 7am to 7pm.

more >

Council apologises and launches inquiry after waste collections missed

14 May 2026

Blood relatives go extra mile for mum

13 May 2026

Hot food idea to help market

13 May 2026

Two new Holbeach Marsh landmarks set to go down a bomb

13 May 2026

King applies for new solar farm

13 May 2026

AIMPing up local musicians

13 May 2026