Road surface work at Gedney Dyke

The disintegrating road surface of the B1359 at Gedney Dyke is due to be repaired.
The stretch of road between Kingsgate/Roper’s Gate junction and Green Dyke will be repaired between next Monday and Wednesday, November 4.
The work will include installing an asphalt reinforcement grid to give the new carriageway a stronger resistance to the movement of the underlying ground.
The road will be closed 24 hours in the first week, open at the weekend and then be closed from 7am to 7pm.

more >

Couple’s medieval ring find to be part of museum

20 Apr 2026

New authority bonuses branded ‘massive mistake’

20 Apr 2026

Solar farm plan heads to next stage

16 Apr 2026

Hopes for sale to save jobs

15 Apr 2026

Jack’s new hope for tumour rehab

15 Apr 2026

Royal reception for inspirational prison officer

15 Apr 2026